Progress Report 2/7/09
2nd July 2009
<-- Index | Showing 1-5 of 5 pictures | Index -->
Pictures showing the latest Progress on B953701, this includes the majority of the external T&G Fitted by Tom Windsor, also the inside T&G is progressing well and the south-end door has been re-fitted.
Inside B953701.
Inside B953701.
820x615
P280609_14.27.jpg
Again.
Again.
820x615
P280609_14.28.jpg
Painted to Undercoat.
Painted to Undercoat.
820x615
P280609_14.28__01_.jpg
Running Side T&G.
Running Side T&G.
820x615
P280609_14.29.jpg
Again.
Again.
820x615
P280609_14.29__01_.jpg