Progress Report 12/9/09
13th September 2009
<-- Index | Showing 1-8 of 8 pictures | Index -->
Latest Pictures showing all the re-fitted external T&G which has been painted upto gloss. Also the re-fitted T&G on the verander end.
Before Re-fitting verander T&G.
Before Re-fitting verander T&G.
820x615
P060909_15.35.jpg
Re-Fitted Side T&G.
Re-Fitted Side T&G.
820x615
P060909_15.35__01_.jpg
And Again.
And Again.
615x820
P060909_15.35__02_.jpg
Sign Written Palvan.
Sign Written Palvan.
820x615
P060909_15.36.jpg
Close Up.
Close Up.
820x615
P060909_15.37__01_.jpg
Re-Fitted Verander T&G.
Re-Fitted Verander T&G.
820x615
P120909_19.00.jpg
PMV ready for major work.
PMV ready for major work.
820x615
P120909_19.00__01_.jpg
The Re-Fitted Verander T&G.
The Re-Fitted Verander T&G.
820x615
P120909_19.01__02_.jpg