Progress Report 15/10/09
15th October 2009
<-- Index | Showing 1-4 of 4 pictures | Index -->
Latest Pictures showing progress inside B953701, with the refitting of the stove area base & side panels. Also the refitting of the bench/seating area.

615x820
P151009_15.51.jpg

615x820
P151009_15.51__01_.jpg

820x615
P151009_15.52.jpg

820x615
P151009_15.55.jpg